Dry container
Choose whenThe dismantled envelope and floor load fit confirmed limits.
CompareFreight saving against cranes, labor, packing and reassembly.
ConfirmDoor, interior, payload, load distribution and unloading method.
Shipping decision from China
Compare the exact machine, packed envelope, mobility, dismantling, ports and destination delivery before choosing dry container, flat rack, RoRo or breakbulk.
Direct answer: do not choose the method by tonnage alone. Measure every package, confirm mobility and dismantling, obtain carrier acceptance and compare total cost to the jobsite.

Preliminary route selector
Four transport routes
A cheap freight line can move cost into dismantling, terminals, cranes or reassembly. Normalize every quote with the same machine, date, ports and Incoterm.
Choose whenThe dismantled envelope and floor load fit confirmed limits.
CompareFreight saving against cranes, labor, packing and reassembly.
ConfirmDoor, interior, payload, load distribution and unloading method.
Choose whenThe machine is OOG but can be secured and lifted on an approved platform.
CompareOOG surcharges, lashing and terminals against less dismantling.
ConfirmFinal dimensions, lashing points, lifting and carrier acceptance.
Choose whenA compatible route exists and the machine can drive or load under port rules.
CompareLess dismantling against sailing availability, fuel, cleaning and port charges.
ConfirmMobility, brakes, leaks, fuel, keys and terminal conditions.
Choose whenThe heavy machine or packages need project vessel, crane and stowage.
CompareLarge-cargo capacity against handling, schedule and heavy inland delivery.
ConfirmLift plan, piece weights, center of gravity, stowage and discharge.
Size and route
Normalize freight quotes
| Cost line | Supplier should state | Forwarder should state | Buyer confirms |
|---|---|---|---|
| Machine | Serial, condition, price and Incoterm | Receiving place and date | Exact unit and beneficiary |
| Preparation | Cleaning, dismantling, protection and packages | Carrier requirements | Destination reassembly cost |
| Origin | Yard, inland haulage and port | Terminal, documents, lifting and lashing | What FOB/CIF includes |
| Ocean | Cargo-ready date | Route, transit, surcharges and insurance | Acceptable timing and risk |
| Destination | Documents and final packing list | Estimated terminal and free time | Customs, crane, permits and delivery |
Evidence chain
Stock examples by route
Confirm availability, condition and packed measurements for the exact unit. The displayed price does not automatically include shipping.


Approx. 7 t | utility class
Year: 2023Hours: 2,010
$14,000 USD
WhatsApp
Approx. 12 t | utility contracting
Year: 2021Hours: 734
$15,000 USD
WhatsApp
Approx. 13.5 t | mixed work
Year: ConfirmHours: Confirm
$17,000 USD
WhatsApp
Approx. 20 t | general earthmoving
Year: 2021Hours: 2,741
$24,000 USD
WhatsApp
Approx. 21.5 t | roads and sites
Year: ConfirmHours: 3,069
$16,000 USD
WhatsApp
Approx. 36 t | mass excavation
Year: 2024Hours: 2,890
$33,000 USD
WhatsApp
FAQ
Sometimes, but only after the exact machine is measured and a dismantling plan is approved. Compact machines are stronger candidates; larger excavators may exceed door, internal, floor-load or payload limits even after removing the boom, arm, bucket or cab. Compare total dismantling and reassembly cost with flat rack, RoRo and breakbulk before booking.
There is no universal winner. Flat rack cost depends on out-of-gauge dimensions, terminal handling, lashing and carrier acceptance; RoRo depends on route, machine mobility, port rules and space. Request both quotes using the same packed dimensions, ports, dates and destination charges, then choose the lower risk-adjusted landed cost.
Provide measured length, width, height and weight for the base machine and every removed package, plus lifting points, center-of-gravity concerns and mobility status. Brochure dimensions are only a starting point because buckets, shoes, guards, attachments and dismantling change the transport envelope.
The freight forwarder and booked carrier or terminal must approve the final transport configuration. The seller can prepare dimensions, dismantling, lifting and lashing evidence, but carrier acceptance controls the booking. Do not release the machine on an unverified verbal plan.
Remove them only when the approved route needs a smaller envelope or safer lift. Dismantling can lower freight exposure but adds cranes, labor, hose protection, package inventory and destination reassembly. Compare the complete route, not the ocean-freight line alone.
Request dated photos and video of the working machine, serial number, dismantled parts, protected openings, lifting, loading, lashing, seal where applicable and every package. Match those records to the packing list, invoice and transport document before the final payment milestone.